Toolbar
Projects

History A 73-year-old veterinary medical practice with a present focus on not only providing the best care possible for companion animals in our area, but also adding the capacity for Critical & Emergency Care that is second to none. The state-of-the-art facility in opened in late 2003, and 24-hour emergency care has been in place since mid-2004. Ann Arbor Animal Hospital’s mission is to provide compassionate, comprehensive, high quality, veterinary care with emphasis on exceptional client services and patient care in a warm, friendly environment for our staff, clients and patients. This new facility has ample parking, a drive-thru pharmacy and on-site grooming facilities. Project Responsibilities Project Manager / Project Architect Project Highlights 8 Exam Rooms, Special Procedures Room, Isolation and Recovery Wards, 2 Surgical Suites Treatment Area, Doctor Offices, Boarding Kennel, Exotic Animal Ward Lobby, Below Grade Parking Garage, Bulk Food Storage and Retail Sales 25,200 SF - $3.5 Million

History The first facility opened on Labor Day in 1978 providing after hours and weekend emergency veterinary care to the clients of the founding member doctors of the Chicago area. Over time the name was changed to Chicago Veterinary Emergency Services. After many years of working in a cramped 25 ft wide building and growing in emergency numbers every year, it was time to build a new facility. The building immediately to the north was bought and it and the original facility were torn down. Emergency services were provided in a trailer while the new facility was being built. CVES also offers specialty care in surgery, internal medicine, dermatology, dentistry, ophthalmology, imaging, neurology, cardiology and oncology, as well as 24/7 emergency care. Project Responsibilities Project Manager/Project Architect Project Highlights Five Exam Rooms, Treatment Area, Dual Surgical Suite, Holding Kennel Lobby and Business Administration, Conference Room, Offices, Employee Lounge 7,400 SF - $1.3 Million

History This project began with an abandoned concrete block horse barn and stable that had not been used in several years. The building was controlled by the Veterinary Medical Research Park on the campus of Texas A&M University. The park needed a facility to conduct hoof disease research due the demolition of the existing facility for the construction of a new large animal clinic. Half the 6" block barn was demolished to provide for the two large laboratory spaces used to treat the horses. These are the high 18 ft. tall walls at the back of the facility. These are new reinforced 8" concrete block walls supporting a 2 ton rail crane used to removed fallen horses. The balance of the facility contains a new handicap restroom, three offices and a feed storage room. The stalls in the foreground were moved from an adjacent location and attached to corral the sick horses. The roof structure of the tall walls are of stressed skin foam core panels, 12" thick. Project Responsibilities Project Manager Project Team 5 Staff in addition to VetMed Staff, MEP Consultant, Physical Plant Central Shop Forces, General Contractor and User Coordinator Project Highlights Incorporate and existing abandoned horse barn with existing relocated corral fencing into Lab facilities Renovate the two facilities and provide additional construction Two Labs with 18' High Ceilings, One Room to have Stock and Ceiling Mounted Winch; New MEP Infrastructure Cleaning Room, Office, Restroom with Shower, Feed Storage Covered Loading Entry and Site Work 3,100 SF - $230,000

History New facility for an existing growing practice using traditional and holistic veterinary medicine to treat a variety of animals. Project Responsibilities Project Manager/Project Architect Project Highlights 8 Exam Rooms, Treatment Area, Surgical Suite, Boarding Kennel, Product Storage Retail Sales, Offices, Lobby, Employee Lounge, Staff Area 9,400 SF - $1.5 Million

Tom Hines

Architect

Our Design Philosophy

“The art of dancing stands at the source of all arts that express themselves first in the human person.  The art of building, or architecture, is the beginning of all the arts that lie outside the person; and in the end they all unite.” - Havelock Ellis
 
Building facilities unique to the owner’s special needs requires creative effort to balance function, aesthetics, durability and affordability in operation.  We help clients move through these challenges and manifest their dreams and desires in tangible form.

Get in Touch

  • Mail Us
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Phone
    817.706.0114
  • Location
    1407 Texas St. Suite 201
    Fort Worth, Texas 76102