Toolbar
Projects

History

  • CRWS has one of the worst situations for high levels of H2S for several reasons:
    • Septic condition of the incoming wastewater
    • Level geography of the site
    • Location of major structures on the site
    • H2S attacks the HVAC systems resulting in frequent replacement and high costs
  • Solution:
    • Minimize installing HVAC equipment outdoors
    • Locate HVAC equipment within the environment it is controlling
    • Utilize water-cooled equipment, not air-cooled
    • Select equipment with H2S corrosion-resistant properties
    • Incorporate additional H2S scrubbing technology to remove H2S from indoor environments

Project Responsibilities

  • Project Manager and Architect of Record
  • Construction Documents and Specifications

Project Highlights

  • Initial design for water-cooled process water supplying five nonprocess buildings converting from air-to-air systems to water-to-air systems with gasphase molecular air cleaning

Tom Hines

Architect

Our Design Philosophy

“The art of dancing stands at the source of all arts that express themselves first in the human person.  The art of building, or architecture, is the beginning of all the arts that lie outside the person; and in the end they all unite.” - Havelock Ellis
 
Building facilities unique to the owner’s special needs requires creative effort to balance function, aesthetics, durability and affordability in operation.  We help clients move through these challenges and manifest their dreams and desires in tangible form.

Get in Touch

  • Mail Us
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Phone
    817.706.0114
  • Location
    1407 Texas St. Suite 201
    Fort Worth, Texas 76102