Project Goals

  • Ensure Infrastructure Stability
  • Optimize Operations: control/lower cost per MG treated WW
  • Reduce and control energy costs: energy cost per MG treated WW

Project Highlights: Proposed Facility Improvement Measures (FIM)

  • FIM 1 & 5: Aeration Basin Upgrades
  • FIM 2: Waste Heat Recovery - New Technology Conversion
    • Existing gas turbines generate more than 4 MW electricity per day (about 50% plant average demand)
    • Most of heat created by existing gas turbines wasted to atmosphere
    • Proposed WHR system captures 100% of waste heat from operating gas turbines and converts the hot exhaust to steam
    • New steam powered turbines will be used to operate rebuilt blowers, allowing two 1000-hp electric motor blowers to be taken offline
    • Conversion from electricity to steam is projected to save about 1.6 MW per day
  • FIM 3a & 3b: Digester Improvements
  • FIM 4: SCADA Replacement
  • FIM 6: DEF Building Systems (lighting & HVAC modifications, power correction factor)

Tom Hines

Architect

Our Design Philosophy

“The art of dancing stands at the source of all arts that express themselves first in the human person.  The art of building, or architecture, is the beginning of all the arts that lie outside the person; and in the end they all unite.” - Havelock Ellis
 
Building facilities unique to the owner’s special needs requires creative effort to balance function, aesthetics, durability and affordability in operation.  We help clients move through these challenges and manifest their dreams and desires in tangible form.

Get in Touch

  • Mail Us
    This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Phone
    817.706.0114
  • Location
    1407 Texas St. Suite 201
    Fort Worth, Texas 76102